Company News

News

November 01, 2013

MBC Corporation and China Nonferrous Metal Industry’s Foreign Engineering and Construction Co., Ltd. (NFC) sign EPC agreement for Ozerny Mining & Processing Plant in the Republic of Buryatia

As part of the 18th regular meeting between the heads of the Russian and Chinese governments Mr.Medvedev and Mr. Li Keqiang, MBC Corporation  and NFC signed the agreement for engineering, procurement and construction of the Ozerny Mining & Processing Plant (Ozerny GOK). Project construction period is 3 years, with production capacity of 8 Mtpa. The cost of construction of the project totals $1,1 billion. This includes the construction cost of mine. processing plant and tailing dam, and also of transport and power infrastructure required for the functioning of Ozerny GOK.

The EPC agreement was signed in pursuance of  the agreements concluded by these two companies in March 2013 by Ilya Okhtyrskiy, the MBC Corporation General Director, and Wang Hongqian,  the President of NFC.

Ozerny GOK is constructed on the basis of Ozernoe deposit (Republic of Buryatia) reserves estimated according to JORC as 157 MT  of ore with  5,2% Zn and 1% Pb.  In addition, Ozernoe deposit ore contains 4.5 thousand tons of silver.

To the news list

Add to my notes

My notes

Print version



You've visited

Whether you know, that

The forum was dedicated to Russian President Vladimir Putin’s visit to Japan.

More

Vote

Where would you like to put your savings?

Vote

Vote results

Company News|About Company|Services|Research|Contacts|События

Home page|Site map

Sites of Group

Copyrights © 2006. All rights reserved.
"METROPOL" Investment Financial Company Ltd.
Phone: 8 (495) 933-3310
Address: 13 bld 1 Donskaya str, Moscow, Russia 119049